Skip to content

4/03266/18/MFA

CPRE Herts strongly objected to the removal of the LA3 site from the Green Belt and the loss of open countryside. CPRE Herts has not been party to discussions on the masterplanning of the site. The site is now allocated and a masterplan, prepared by the developer, was approved in July 2017. The masterplan is a material planning consideration. While CPRE Herts much regrets the allocation, given the fact of development it also considers the details of the design, layout and relationship to Hemel Hempstead, countryside and nearby villages to be extremely important.

Added 6 March 2019
PDF 348.40 Kb